To the central content area

Surveillance and Consultation Project for Enterprise Waste Management(Ⅳ)

Absrtact
This is a project with four years executing period which is executed from 2002 and extended from the project of” Industrial Waste Examination and Counseling” in 2001. The annual objectives of this year are carrying out works of check, guidance, tracing and ameliorating for industrial waste treatment with 1,100 companies which including businesses, waste treatment facilities and waste reuse facilities. To approach the purposes of properly treated the industrial waste, the key points of this project include the items of the situation and waste flow for waste generation, clearance, recycling, and reuse; counseling businesses to be fa miliar with the management knowledge and declaration way enhancing businesses to recognize the technologies and regulations with waste clearance, treatment, and reuse; setting up the analysis and estimate relationships of wastes with industries and processes, compiling the reference manual of industries and process technologies; checking operation situations of industrial waste clearance, treatment, and reuse facilities, evaluating operation abilities of above facilities, and counseling these facilities ameliorate their hardware and operation management. In this project, the industrial waste check, counseling, ameliorating or tracing, and necessary sampling and analysis of 4,200 businesses, industrial waste clearance, treatment, and reuse facilities have finished in past three years. They have set the relationships between industrial and raw materials and products with checked industries, and the produced factor model is made simultaneously. We also edit 10 different industries’” The Inspection Manual of Ind ustrial Waste with Industries Processes” and update another 10 manuals are edited in 2003. Furthermore, this project has assisted EPA to draft the operation parameters declaration system of major treatment equipments of waste clearance and treatment facilities. The results of work items which are necessary to pay for EPA behind the ending report of this project are finished on sche
Keyword
Surveillance,Consultation,waste,clearance,treatment,reuse,improvement,inspect,discharge factor
Open
top